狠狠亚洲,奇米888在线看奇米999,美女**视频一级毛片,免费啪视频一区二区三区,高清国产在线,视频国产在线,欧美亚洲国产一区二区三区

Home About us News center Products Innovation Careers
industry news
company news
industry news
media focus
video
BP to restart damaged PTA unit in limited capacity by November
 
 

By Frank Esposito
SENIOR STAFF REPORTER
Published: September 19, 2014 10:27 am ET
Updated: September 19, 2014 11:10 am ET


Image By: British Petroleum plc
British Petroleum plc's Cooper River plant.


British Petroleum plc may restart its fire-damaged purified terephthalic acid (PTA) feedstock unit in South Carolina in late October or early November, but not at full rates.

A source close to BP said that those dates are the firm’s “best estimate” of a restart date for the PTA unit, which is at BP’s site in Cooper River, S.C. PTA is used as a feedstock to make PET resin. The outage played a role in PET bottle resin prices increasing by 2 cents per pound in August, when market watchers had expected a slight decrease.

The unit was shut down on Aug. 9 after a fire damaged a compressor building at the site. No one was injured by the fire, which was extinguished in less than an hour. No cause for the fire has been identified.

BP’s other PTA unit at the site continues to operate. The site has a combined total PTA production capacity of about 1.6 billion pounds per year.

 
About us
company profile
company culture
version and strategy
company history
certification
patents
contact
News center
company news
industry news
media focus
video
Products
products catalog
technical support
Innovation
create value
production line
QA&QC
new technique info
Copyright:King-Tech China Co.,Ltd
乐陵市| 延安市| 广宗县| 海安县| 藁城市| 富锦市| 铁力市| 延庆县| 肇庆市| 会理县| 平远县| 杭锦旗| 海原县| 淮滨县| 宜良县| 湖州市| 若尔盖县| 共和县| 安徽省| 江油市| 湾仔区| 襄城县| 喜德县| 元氏县| 桐柏县| 石泉县| 阿拉善左旗| 兴城市| 永寿县| 灯塔市| 视频| 佳木斯市| 赞皇县| 大兴区| 疏勒县| 新和县| 通化县| 泸水县| 五河县| 龙川县| 麻江县|